Gemini Project - Timeline: Unterschied zwischen den Versionen
Zur Navigation springen
Zur Suche springen
(neues Release GP3.3) |
(neues Silvesterrelease) |
||
Zeile 609: | Zeile 609: | ||
at:06/12/2014 text:"0.81-r19" | at:06/12/2014 text:"0.81-r19" | ||
at:16/02/2015 text:"0.81-r21" | at:16/02/2015 text:"0.81-r21" | ||
− | at:04/12/2015 text:"0.82-r19" #aktuelle VERSIONSNUMMER und DATUM eintragen | + | at:04/12/2015 text:"0.82-r19" shift:(0,-12) |
+ | at:31/12/2015 text:"0.83-r19" #aktuelle VERSIONSNUMMER und DATUM eintragen | ||
at:01/04/2010 text:"GP3.3" shift:(0,-11) | at:01/04/2010 text:"GP3.3" shift:(0,-11) |
Version vom 3. Januar 2016, 21:25 Uhr
EasyTimeline 1.90
Timeline generation failed: 4 errors found
Line 333: bar:_ width:5 from:01/01/2004 till:22/11/2024 color:colTrennLi
- Plotdata attribute 'till' invalid.
Date '22/11/2024' not within range as specified by command Period.
Line 486: bar:__ width:5 from:01/01/2004 till:22/11/2024 color:colTrennLi
- Plotdata attribute 'till' invalid.
Date '22/11/2024' not within range as specified by command Period.
Line 539: bar:GP3.3 width:40 from:14/11/2014 till:22/11/2024 color:red
- Plotdata attribute 'till' invalid.
Date '22/11/2024' not within range as specified by command Period.
Line 567: at:22/11/2024 color:red width:0.1
- LineData attribute 'at' invalid.
Date '22/11/2024' not within range as specified by command Period.